Installation of ''Berge Helene'' in the Chinguetti Field, Offshore MauritaniaChinguetti is an offshore oil field located off the coast of the Islamic Republic of Mauritania, North West Africa. Under a PSC with the Mauritanian Government, the development is operated by Woodside Mauritanian on behalf of AGIP, Hardman Petroleum, Fusion Oil and Gas and Roc Oil. Having been discovered in 2001, the field has an area of around 12km² and a diameter of 4.5km feeding three principle gas terminals, namely Chinguetti, Tiof and Banda.
|
|
|
Mobilisation of Vessels Once operational procedures had been established, the required vessels were mobilized. In total six vessels were used; two large D Class II Anchor Handling Vessel, one acting as the Main AHV (with a mezzanine deck to support an ROV) and a second for support, also a large barge for transportation of the suction anchors, and finally three tugs to position the FPSO. |
|
|
Instillation of Single Point Mooring Using the Support AHV a single point mooring buoy was installed within the Chinguetti field. The system consisted of a Stevmanta VLA anchor connected to a fibre wire and buoy assembly- |
|
|
Pre-instillation of the FPSO Mooring System At this stage the suction anchor was connected to the mooring chain. Thereafter, using the Main and Secondary AHV`s, the suction anchor was moved into place and connected to the suction pump. Upon completion the Suction Anchor Handling Frame and ROV were demobilized. |
![]() |
|
Mooring of the FPSO Berge Helene With the combined use of the Main AHV and the ROV, the pre-laid mooring lines were connected the FPSO turrent guide locks. The tug vessels were used to bring the FPSO onto location and maintain its position throughout the project. |
![]() |
Reliance Field Project: Mooring ''Smart-1/Dhirubhai-1'' FPSO in Bay of Bengal, off the East Coast of India
The Dhirubhai offshore oil and gas field, located in the Krishna Godavari Basin in the Bay of Bengal, approximately 60 kilometers from Kakinada. Reliance Industries Limited is responsible for developing the field, which comprises an approximate area of 15sq kilometers with wells in deep water at 1200 meters. |
|
|
Mobilisation of Vessels
To support the magnitude of this operation a total of six vessels were in use namely, Olympic Pegasus (AHT), Far Scout (AHT), SAL Type 161B (HLV), one submergible barge, and two local support vessels. |
|
|
Mooring For this project an APL produced Submerged Turret Production (STP) system was chosen as the mooring system. In total nine mooring lines were installed to keep the FPSO in place for its scheduled ten years of service. |
|
Other project locations |
|
|
Rio de la Plata, Argentina Neptune Oil Field, Gulf of Mexico, United Stated Cascade and Chinook Subsea Development, Gulf of Mexico, Mexico North East Gateway, Massachusetts Bay, USA Tupi Oil Field, Brazil Peregrino Oil Field, Campos Basin, Brazil Bilabri Oil Field, Nigeria Bonny River, Niger Delta, Nigeria Adanga Oil Field, Gulf of Guinea, Nigeria Gjoea Oil Field, The North Sea, Norway Volve Oil Field, The North Sea, Norway Bombay High Oil Field, offshore Mumbai, India Azurite Oil Field, offshore Republic of the Congo Shah Deniz Alpha Field, Caspian Sea, Azerbaijan |
|
|
Story coming soon. |
|
|
|
|
|
|
|
![]() |
|